1

50TPH Zinc and Lead Process Plant in Iran

  • Raw material :Zinc and Lead Ore
  • Capacity: 50t/h
  • Main Equipment: Vibrating Screen, Ball Mill, Spiral Chute, Vibrating Classifier, floatation.
  • Location: Iran

Project Details

Background:

Pb-Zn ore divides into sulfide Pb-Zn ore and oxide Pb-Zn ore. Flotation is the most widely used in separating sulfide Pb-Zn ore, to separate zinc and plumbum, sometimes for separating sulfide iron and other minerals. Sulfide Pb-Zn ore process divides into priority flotation process, mix-separating flotation, asynchronous flotation, and so on.

The deposit was characterized by carbonatite. The raw ore consisted of two metallic minerals (galena and blende) and one gangue mineral (diopside). The max feeding size is 400mm. 50% size is 100mm,25% size is 150mm & 25% size is 400mm. It had a grade of 5.61g/t.

Solution:

1 . Two-stage closed-circuit crushing-one-stage self-grinding and lead roughing concentrates regrinding-differential flotation-two-stage dewatering.

2 . After the raw ore was ground, lead concentrates were produced through one-stage roughing, three-stage scavenging and three-stage concentration, with a recovery of 92%.

3 . The dehydration operation was carried out by disc vacuum filter, and the dehydration rate was more than 95%.

Feedback

The processing capacity of this project was 1200t/d, and the final products were lead concentrate and zinc concentrate. The grade of lead concentrate and zinc concentrate was 56.03% and 51.85% respectively.

Service Support

  • -Test run the machine 48 hours before delivery.
  • -You can take the material to the factory to test the machine.
  • -We will customize the solution according to your needs.
  • Receive after-sales demand

  • Matching engineer

  • Arrived at the scene

Contact Us

Leave A Message

Related Products

Related Cases

Online

Inquiry

Tel

+8619103712811

Email

sales@hongjigroup.com

Whatsapp

TOP

Submit Request