1

Zambia 2000t/d Copper Mineral Processing Plant

  • Raw material: Copper ore
  • Capacity: 2000t/d
  • Main Equipment: Crusher, Ball Mill, Classifier, Flotation, Tank.
  • Location: Zambia

Project Details

Background:

Hongji has provided a successful 2000t/d copper process plant in Zambia. We design the tin process plant flowchart & plant layout drawing according to ore conditions, provide a complete set of plant machines and send Chinese engineers to the mine site for plant installation & commissioning guidance.

Process:

The copper ore mining process flow is Hopper-> Crushing and Screening:-> Grinding and Classification-> Flotation-> Concentrate Dewatering.

Feedback:

The original copper grade was 7.0%; copper concentrate grade was 26.5%; copper concentrate production rate was 25.1% and copper recovery rate was 95.0%.

Service Support

  • -Test run the machine 48 hours before delivery.
  • -You can take the material to the factory to test the machine.
  • -We will customize the solution according to your needs.
  • Receive after-sales demand

  • Matching engineer

  • Arrived at the scene

Contact Us

Leave A Message

Related Products

Related Cases

Online

Inquiry

Tel

+8619103712811

Email

sales@hongjigroup.com

Whatsapp

TOP

Submit Request